Word document explaining the LFM agregation rules

View file
name20240415_ACUITY_Consolidated_vs_Raw_Reports_Laundry.docx

Consolidated vs Raw reports – LFM Rules

...

Consolidated receiving at Laundry

 

 

Quantity in RAW EVENT report

Quantity in CONSOLIDATED RECEIVING report

Comments

Item received that was previously shipped to a customer (nominal case)

X

X

If receiving occurs >8h after shipment

Item received that was  shipped very short time ago

X

 

LFM Setting HOURS_LIMIT: delay after shipping to take into account a receiving. By default set to 8h.

Useful if the exit door of the laundry is closed to the entrance where the soiled linen is scanned

Item missed at portal (receiving) but scanned on soiled conveyors (launching)

 

X

(launching process)

 

X

Benefit of multiplying the successive reading points in soiled reception

Item received successively twice

X

 

(2 records)

X

 

(first reception only)

The second event is ignored in consolidated receiving report, whatever the delay between the 2 receptions.

Item that was previously shipped (delivery day reached) and that is scanned in the laundry (washing, packing, shipping, condemning etc.)

 

X

Receiving event is created a posteriori

(at timestamp of the scan in the laundry)

Rejecting at laundry

X (rejecting)

X

 

Receiving event is created in // for each reject (no need to scan the rejected items through a receiving station)

 

 

 

 

 

Consolidated shipping at Laundry

 

 

Quantity in RAW EVENT

Quantity in CONSOLIDATED SHIPPING

Comments

Items shipped to a customer (nominal case)

X

X

 

Item shipped successively twice to the same customer (with delivery day + day_limit not reached)

X

 

(the 2 successive shipments)

X

 

(second shipment only)

The first event is ignored in consolidated shipping report

 

Delivery day : set on the smart reader for the shipping (ex : today, tomorrow…)

 

Day limit : ACUITY duration parameter.

 

Exemples :

 

day_limit set to 1 and Delivery day = today

à the first shipment (Date D) will be ignored in consolidated shipping if the second one occurs before D+1 at 00H00

 

day_limit set to 1 and Delivery day = tomorrow

à the first shipment (Date D) will be ignored in consolidated shipping if the second one occurs before D+2 at 00H00

Item shipped successively twice to 2 different customers (delivery day + day_limit not reached)

X

 

(the 2 successive shipments)

X

 

(second shipment only)

Same as just above

Item inventoried at Customer site whereas it was considered at the laundry (or never seen yet)

 

X

Shipping event created a posteriori

(at inventory timestamp minus 1h)

Item inventoried at Customer B whereas it was previously shipped to customer A

 

 

No effect on consolidated shipping report, but

Delivery customer (in tag state table) is updated.

Shipping event remain the first shipment to Customer A